Gallery
Project Specification
Details
Situated in Central London close to Buckingham Palace, The Houses of Parliament and Westminster Abbey, the Westminster City School opened its current building in 1877. The most recent addition to this renowned school building has been the erection of a 3 storey building to the rear of the site with the purpose of expanding the school by 1 Form Entry.
Brief
The main contractor Neilcott Construction handed the responsibility of the washroom package to Cube Install and we took ownership for the Design, Supply and Installation of the Toilet Cubicles, Duct Panelling and Vanity Units.
Solution
Solutions were provided for Student and Staff facilities – Full height Altitude SGL cubicles met the stringent privacy & durability requirements for the high traffic Student Washrooms whilst HPL Duct panelling finished in a popular woodgrain provided an exclusive finish to the Staff toilets.
Overall this was an honourable project to be involved in and with its challenging logistics and programme, it suited our flexible approach which provided a fast paced service, centred around the contractors requirements.
Download Case Study PDF
Working on a similar project? Send us a message with your requirements
Call us on 01692 632000 or email: info@cube-install.com
Send us a message