Project Specification

Details

Situated in Central London close to  Buckingham Palace, The Houses of Parliament and Westminster Abbey, the Westminster City School opened its current building in 1877.  The most recent addition to this renowned school building has been the erection of a 3 storey building to the rear of the site with the purpose of expanding the school by 1 Form Entry.

Brief

The main contractor Neilcott Construction handed the responsibility of the washroom package to Cube Install and we took ownership for the Design, Supply and Installation of  the Toilet Cubicles, Duct Panelling and Vanity Units.

Solution

Solutions were provided for Student and Staff facilities –  Full height Rise SGL cubicles met the stringent privacy & durability requirements for the high traffic Student Washrooms whilst HPL Duct panelling finished in a popular woodgrain provided an exclusive finish to the Staff toilets.

Overall this was an honourable project to be involved in and with its challenging logistics and programme, it suited our flexible approach which provided a fast paced service, centred around the contractors requirements.

Working on a similar project? Send us a message with your requirements

Call us on 01692 632000 or email: info@cube-install.com

Send us a message