Gallery
Project Specification
Details
The Kew House School opened its new Sixth Form Centre in September 2017 as an independent learning centre for the young adults that study there.
The professional feel of the centre is enhanced by the washrooms, which are positioned as a selection of smaller areas, each providing facilities for up to two to three students at a time.
Brief
The team at Cube appreciated being involved in this project as the subcontractor for the WC Cubicle package and we were pleased display our flexibility in sourcing the non-standard laminate colours that had been selected.
Solution
Challenger SGL cubicles were supplied and installed along with factory framed IPS panelling, vanity units and Corian tops. The centre can be assured of the durability of the products which are supplied with a manufacturer’s guarantee and over 45 years of ancestry from Dunhams Washroom Systems.
Download Case Study PDF
Working on a similar project? Send us a message with your requirements
Call us on 01692 632000 or email: info@cube-install.com
Send us a message