Gallery
Project Specification
Details
Installation of flush fronted cubicle systems has just been completed in these corporate offices situated in central London, surrounded by iconic buildings and renowned architecture.
Brief
Washrooms play a key role in any building design and the Vista HPL cubicle systems installed provide the blend of a prestigious flush fronted facade and the great value of High Pressure Laminate.
The cubicle solution has been paired with coordinating floor to ceiling duct panelling and vanity units that are fitted with durable, solid surface wash troughs to provide an exclusive finish in these commercial washrooms.
Solution
Here at Cube we have inherited 50 years of manufacturing excellence from our founding company Dunhams Washrooms. This combined with our flexible design ability and responsibly managed installation provides the 1st choice solution to contractors looking for subcontract WC cubicle installers.
Download Case Study PDF
Working on a similar project? Send us a message with your requirements
Call us on 01692 632000 or email: info@cube-install.com
Send us a message