Project Specification

Details

Cube Install were appointed by the property developer to take responsibility as sub-contractor for the design, supply and installation of the WC Cubicle package on this project.

Brief

With washrooms installed on all five floors we maintained close communication with the developer to ensure 100% design satisfaction and keep the installation aligned with the construction programme.

Co-ordination is always a challenge in washroom areas with the large variety trades working in confined spaces. At Cube we are proud to offer a flexible project approach, adapting installation to fit in with other trades whilst keeping to the washroom installation programme.

Solution

Cubicles: Duke SGL Full Height WC Cubicles

IPS Duct Panelling: SGL Duct Panelling system

Vanity Units: Premium surface vanity units fabricated from Corian Solid Surface materials

Working on a similar project? Send us a message with your requirements

Call us on 01692 632000 or email: info@cube-install.com

Send us a message